Both detectors had been carefully removed and specially packed in our logistics facility as the width of the gantry with the detectors was too wide for the entrance of the elevator
Many meters of floor were to be covered for the equipment to be wheeled to its place of use
After positioning and putting back the detectors on the gantry, the Lupprians crew started the mechanical installation and cabling.